One version of every drawing.And every change, traced.

Drawings, submittals, RFIs and variations move through their own approval flows across every party, so everyone works from the current revision and every change is priced and approved before work starts.

Approvals inbox with who holds each document

Why it matters

Which drawing is current? Who approved the change? Was it ever priced?

Revised drawings get buried in chats, and a variation is discovered on day one of mobilisation. A change is not just a document: it moves the budget, the programme and the procurement, and it has to be recorded everywhere before work proceeds.

Approval flows and the CDE

Every document goes to the right desk.On whatever channel they use.

Drawings, RFIs, instructions, variations and payment applications move through each party's portal, WhatsApp and email, and land back on one record. You see who holds each one, and for how long.

IPA #4 · Block B
Contractor
Quantity surveyor
Architect
Project manager
Developer
Bank
  1. 1ContractorUploads the IPA workbook PortalMon 09:10
  2. 2Quantity surveyorMeasures, checks each line against the BOQ and the scan PortalTue 15:40
  3. 3ArchitectReviews and signs the certificate EmailWed 11:05
  4. 4DeveloperApproves payment with a one-time code WhatsAppWed 18:22
  5. 5BankSees the certificate and the evidence pack PortalThu 08:00
With Contractor now · nudged automatically if it waitsEach step signed, timed and kept on the record

Documents and coordination · the screens

One register,with who holds each item.

Track · what you can do

What you can do.Programme, BIM, orders, documents and money.

  • The current revision

    Every drawing and submittal with its number, revision and status.

  • Reviews with an owner

    Each stage shows who holds it, for how long and what is missing.

  • RFIs to instructions

    An answer with a cost becomes a variation and a site instruction, linked.

  • Changes priced first

    Variations valued and approved, with their cost and time impact.

  • A portal for every party

    Architect, engineers, QS, PM and contractor each act in their own inbox.

The result

Fewer decisions made on old information, and a traceable chain from request to instruction.

Questions

About Documents, changes and approvals.

Something else on your mind? Walk through it with us on your own project.

  • No. Each party gets a portal and email reminders; nothing has to be installed.

  • Yes. Drawing registers and trackers can be imported from Excel.